1. Home
  2. Projects
  3. File server to SharePoint

Move your file server to SharePoint and Teams

Retire the server. Keep every file.

Your file shares move into SharePoint and Teams, with permissions rebuilt by group. The right people see the right folders, from anywhere, and nothing is left behind.

What IT calls itFile server to SharePoint Online and Teams migration

Before and after

Where you are now. Where this gets you.

Before

The file server is out of warranty, and replacing it is another capital bill. The VPN exists mostly so people can reach the S: drive. And nobody is sure who has access to the HR folder.

  • Your file server is old, or out of warranty
  • People need their files away from the office
  • Nobody's sure who can open what
  • The VPN is there just to reach the shared drive
After

Monday morning. An estimator opens the quotes library on a tablet at a client's site. Two people co-author the same spreadsheet. And there's one less server to replace.

How it works

From the S: drive to files that follow your people.

Every share is copied in the background, checked, then switched over on a weekend.

Backed up every day, and one less server to replace.
How it goes

5 steps, start to finish.

What you do, and what we do, at each step. Open “More” for the detail.

  1. 1
    Before you commit

    Every share mapped, with its permissions.

    You
    Book a planning call, and tell us which folders each team uses.
    We
    Scan the file server for size, structure and permissions, and flag anything that won't migrate as is.
    More
    • Long paths and invalid characters
    • Applications that need a mapped drive, like some older accounting software
    • A one-page plan, a fixed quote and a proposed site structure
  2. 2
    Weeks 1 to 2

    A new structure, agreed with you.

    You
    Agree the site structure, and who belongs in each team.
    We
    Build the SharePoint sites and Teams, set permissions by group rather than by person, and pilot one team.
  3. 3
    Weeks 3 to 4

    Copied while you keep working.

    You
    Work as normal.
    We
    Copy every share in the background, reconcile file counts and sizes, and sync the new libraries to File Explorer.
  4. 4
    Cutover weekend

    Cut over on a weekend.

    You
    Save and close your files on Friday.
    We
    Set the file server to read-only, copy the final changes, and replace the old drive mappings.
  5. 5
    Once you're sure

    Then the server can go.

    You
    Tell us when you're confident nothing is missing.
    We
    Decommission the server, and back up SharePoint, OneDrive and Teams every day.
Questions

Questions we get asked.

Something else on your mind? Ask us on the planning call.

Should our files go in SharePoint, Teams or OneDrive?

All three, each for its own job. Team files live in SharePoint, and Teams shows them beside the team's chat. Each person's own working files live in their OneDrive. We agree the structure with you before anything moves.

Can we still open files from File Explorer?

Yes. SharePoint libraries sync to File Explorer, so people open and save files the way they do now. Several people can also co-author the same Office file at once.

What about applications that need the file server?

Some applications, like older accounting or design software, need a mapped drive and won't run from SharePoint. We find them first and plan where each one goes: Azure, Azure Virtual Desktop, or staying where it is for now.

Is SharePoint backed up?

Microsoft keeps SharePoint running, but protecting what's in it is your responsibility. We back up SharePoint, OneDrive and Teams with Dropsuite every day, so a file or folder can be restored to an earlier point.

How long does a file server migration take?

Usually about a month from start to finish, with cutover over a weekend. A very large file server takes longer to copy, and the plan will say so.

See more. Respond faster. Stay secure.

Anyone can copy files. We make sure everyone can find theirs on Monday.

Tell us what's changing. You get a one-page plan: what moves, in what order and when, then a fixed quote before you commit.

Pick a time